Build Better More
The Build Better More (BBM) is the infrastructure program of the Marcos administration (2022–2028). It superseded the Build! Build! Build! infrastructure program of the Duterte administration (2016–2022). The following Infrastructure Flagship Projects (IFP)s were identified by the National Economic and Development Authority (NEDA).
The Marcos administration approved 194 infrastructure projects, ranging from public transport, power, health, information technology, water resources, and agriculture.[1][2] 77 of those project were carried from past administrations while 123 are “new and initiated” by the Marcos administration.[3] The total cost for the Build Better More program is PHP 9-trillion.[3]
Infrastructure Flagship Projects
Public transportation
Project | Construction | Status | Completion date | Ref. |
---|---|---|---|---|
Rail transportation | ||||
LRT Line 2 West Extension | Proposed | |||
LRT Line 1 Cavite Extension | 2019– | Under-construction | ||
Metro Manila Subway (Phase 1) | 2019– | Under-construction | ||
Mindanao Rail Project (Phase 1) | Proposed | |||
MRT Line 3 Rehabilitation Project | Proposed | |||
MRT Line 4 | Proposed | |||
MRT Line 7 | 2017– | Under-construction | 2023 | |
North–South Commuter Railway | 2019– | Under-construction | 2025 | |
PNR South Long Haul | Proposed | 2025 | ||
Subic–Clark Railway | Proposed | 2024 | ||
Urban transportation | ||||
Cebu Bus Rapid Transit Project | 2022– | Under-construction | ||
Davao Public Transport Modernization Project | Under-construction | |||
Taguig Integrated Terminal Exchange | Proposed |
Roads
Project | Construction | Status | Completion date | Ref. |
---|---|---|---|---|
Arterial Road Bypass Project Phase III (Plaridel Bypass) | Proposed | |||
Bacolod-Negros Occidental Economic Highway | Proposed | |||
Boracay Circumferential Road | Proposed | |||
Cagayan de Oro Coastal Road | Proposed | |||
Davao City Bypass Construction Project | Proposed | |||
Davao City Coastal Road Project, including Bucana bridge | Proposed | |||
Improving Growth Corridors in Mindanao Road Sector Project | Proposed | |||
Laguna Lakeshore Road Network Development, Phase I | Proposed | |||
Metro Manila Bridges Project (under ADB Financing Facility) - 3 Bridges | Proposed | |||
Pasacao-Balatan Tourism Coastal Highway | Proposed | |||
Priority Bridges Crossing Pasig-Marikina River & Manggahan Floodway Bridges
Construction Project (under China Government Facility) - 3 Bridges |
Proposed | |||
Road Network Development Project in Conflict Affected Areas in Mindanao | Proposed | |||
Expressways | ||||
Camarines Sur Expressway | Proposed | |||
Davao City Expressway | Proposed | |||
NLEX-SLEX Connector Road | 2019-2023 | Under-construction | 2023 | |
Inter-island Bridges | ||||
Bataan–Cavite Interlink Bridge | 2023-2027 | Proposed | 2027 | |
Cebu-Bohol Bridge | Proposed | |||
Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project | Proposed | |||
Panay-Guimaras-Negros Inter-Island Link Bridge | Proposed | |||
Panglao-Tagbilaran City Offshore Bridge Connector | Proposed | |||
Panguil Bay Bridge | 2021–2023 | Under-construction | December 2023 |
Airports
Project | Construction | Status | Completion date | Ref. |
---|---|---|---|---|
New Manila International Airport | 2020–2026 | Under-construction | 2026 | [4] |
Seaports
Project | Construction | Status | Completion Date | Ref. |
---|---|---|---|---|
New Cebu International Container Port | Proposed | March 28, 2024 |
Urban development
Project | Construction | Status | Completion date | Ref. |
---|---|---|---|---|
Ambal Simuay River and Rio Grande de Mindanao River Flood Control and Riverbank Protection Project | Proposed | |||
Cavite Industrial Area Flood Risk Management Project | Proposed | |||
EDSA Greenways | Proposed | |||
Emergency Assistance for Reconstruction and Recovery of Marawi (Output 2: Reconstruction and Development Plan for a Greater Marawi, Stage 2) | Proposed | |||
Flood Risk Improvement and Management Project for Cagayan De Oro River | Proposed | |||
Integrated Disaster Risk Reduction and Climate Change Adaptation (IDRR-CCA) Measures in the Low-Lying Areas of Pampanga Bay Project Stage II | Proposed | |||
Metro Manila Flood Management Project, Phase I | Proposed | |||
Metro Manila Priority Bridges for Seismic Improvement Project | Proposed | |||
Pasig-Marikina River Channel Improvement Project, Phase IV | Proposed | |||
Pasig-Marikina River Channel Improvement Project, Phase V | Proposed | |||
Philippines Seismic Risk Reduction and Resilience Project | Proposed |
References
- Gregorio, Xave (December 29, 2022). "Goodbye 'Build, Build, Build'; P1.196-T sought for PBBM's 'Build, Better, More' infrastructure program". The Philippine Star. Archived from the original on December 29, 2022. Retrieved December 30, 2022.
- "Marcos admin bares P9-T flagship infra projects; 45 to funded by PPPs". PhilStar Global. March 9, 2023. Retrieved March 10, 2023.
- "NEDA Board OKs ₱9-T infra projects". CNN Philippines. March 9, 2023. Retrieved March 10, 2023.
- Vera, Ben O. de (March 9, 2020). "2 major airport projects prepare for 2020 liftoff". Philippine Daily Inquirer. Archived from the original on October 17, 2020. Retrieved October 12, 2020.