Line 12 (Guangzhou Metro)
Line 12 of the Guangzhou Metro (Chinese: 广州地铁12号线) is a fully automated rapid transit line under construction in Guangzhou, China.[1] It was originally planned to open for operation in 2023,[2] but due to the obstruction of the construction progress, it was announced in 2022 that it was expected to be completed in 2024.[3]
| Line 12 | |
|---|---|
| Overview | |
| Status | Under construction |
| Locale | Guangzhou, Guangdong, China |
| Termini | |
| Stations | 25 |
| Service | |
| Type | Rapid transit |
| System | Guangzhou Metro |
| Services | 1 |
| History | |
| Opened | 2024 |
| Technical | |
| Line length | 37.6 km (23.36 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
History
Construction officially began in November 2018.[4]
Stations (north to south)

Map of Line 12
| Station name | Connections | ||||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Xunfenggang | 浔峰岗 | 6 | |||
| Liheng Lu | 里横路 | ||||
| Chatou | 槎头 | 13 | |||
| Julong | 聚龙 | 8 | |||
| Baiyun Railway Station | 白云站 | 22 8 (via Shitan) | |||
| Nanhang Xincun | 南航新村 | ||||
| Xinshixu | 新市墟 | 14 | |||
| Baiyun Culture Square | 白云文化广场 | 2 | |||
| Yunxi Park | 云溪公园 | ||||
| Xiaojinzhong | 小金钟 | ||||
| Jingyun Lu | 景云路 | ||||
| Guangyuan Xincun | 广园新村 | 11 | |||
| Hengfu Lu | 恒福路 | ||||
| Jianshe Liumalu | 建设六马路 | 13 5 (via Taojin) | |||
| Martyrs' Park | 烈士陵园 | 1 | |||
| Donghu | 东湖 | 6 10 | |||
| Ersha Island | 二沙岛 | ||||
| Lingnan Square | 岭南广场 | ||||
| Chigang | 赤岗 | 8 | |||
| Chisha | 赤沙 | ||||
| Chishajiao | 赤沙滘 | 11 | |||
| Luntou | 仑头 | ||||
| Guanzhou | 官洲 | 4 | |||
| Higher Education Mega Center North | 大学城北 | 4 | |||
| Higher Education Mega Center South | 大学城南 | 4 7 | |||
Rolling stock
Line 12 will use GoA4 fully automated, 6-car type A trains with a maximum speed of 80 km/h.[5][6]
References
- "广州地铁十二号线将实现无人驾驶_央广网". www.cnr.cn. Retrieved 2022-11-13.
- "广州地铁12号线将设17个换乘站并设支线" [Guangzhou Metro Line 12 will have 17 transfer stations and a branch line]. 新华网 (in Chinese). 21 September 2018. Retrieved 12 February 2021.
{{cite web}}: CS1 maint: url-status (link) - 徐振天 (2022-03-22). "建设进度不理想,广州3条地铁延迟一年竣工". 金羊網 (in Chinese (China)). 廣州. Retrieved 2022-03-27.
- "广州一天开建6条地铁" [Guangzhou starts construction on six metro lines in a single day]. 人民网 (in Chinese). 20 November 2018. Retrieved 12 February 2021.
{{cite web}}: CS1 maint: url-status (link) - "中车株机研制时速80公里全自动驾驶地铁列车". Archived from the original on 2021-12-20.
- "广州市轨道交通十二号线工程(浔峰岗~大学城南)环境影响报告书全本公示". 2018-03-05. Archived from the original on 2018-04-03.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.