MRT Line 6 (Dhaka Metro)
The MRT Line 6 (Bengali: এমআরটি লাইন ৬) is Dhaka's first rapid transit line. It is the first of the Dhaka Metro Rail system and is operated by Dhaka Mass Transit Company Limited (DMTCL). The section from Uttara to Agargaon started operations in December 2022. By January 2023, trains stopped only at the terminals and Pallabi. The second phase, running from Agargaon to Motijheel is scheduled to open in December 2023. Finally, a 1.16 km extension to Kamalapur is expected to open in 2025.[1][2]
Mass Rapid Transit Line 6 | |||
---|---|---|---|
![]() MRT Line 6 in Agargaon metro station | |||
Overview | |||
Status | Operational | ||
Owner | Dhaka Mass Transit Company Limited | ||
Locale | Dhaka, Bangladesh | ||
Termini |
| ||
Stations | 17 | ||
Service | |||
Type | Rapid transit | ||
System | Dhaka Metro Rail | ||
Depot(s) | Diabari, Uttara | ||
Daily ridership | 240,000 (estimated) | ||
History | |||
Opened | 29 December 2022 (Uttara–Agargaon) | ||
Last extension | Kamalapur (2025) | ||
Technical | |||
Line length | 21.26 kilometres (13.21 mi) | ||
Number of tracks | 2 | ||
Character | Elevated | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 1,500 V DC overhead catenary | ||
Operating speed | 100 km/h (62 mph) | ||
Highest elevation | 13 metres (43 ft) | ||
|
History
Planning
In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[3] The World Bank helped to develop this plan, which proposed the construction of three MRT lines in Dhaka. Three years later, the Japan International Cooperation Agency (JICA) joined the metro rail project. In the Urban Traffic Formulation Study, JICA considered MRT Line 6 the most profitable and important of the proposed lines. A feasibility study was conducted for the construction of this line in the financial year 2010–2011. In 2013, JICA hired a consultant and financed the construction of MRT Line 6.[4] A draft route was mapped in 2011. According to this map, the line was supposed to be from Uttara to Sayedabad. Jamilur Reza Choudhury, chairman of the Review Committee of the Strategic Transport Plan, requested prime minister Sheikh Hasina change the route.[5] Later, the route map was modified slightly to finalize the current route map. JICA wanted to build Uttara metro station above ground, and the remaining stations underground, but E. Sreedharan, an Indian mass transit expert, recommended building an entirely elevated line, as he believed an underground metro line would be to expensive to build and operate. This resulted in the current route, which is entirely on elevated track. On 28 December 2014, the conceptual design of Line 6 was created. A detailed design of the line was prepared in August 2016.[3]
Construction
.jpg.webp)
In 2016, the July 2016 Dhaka attack took place during the call for tenders for the construction of the line. The terrorist attack led to some companies withdrawing from the tender process due to security concerns. Seven Japanese officials associated with the project died in the attack. Six months later,[6] with the assurance of the government, the contractors started the construction work. The proposed station at Bijoy Sarani was to be built in front of the Bangabandhu Military Museum, but due to the objection of the Bangladesh Air Force, it was planned to be built near the Jatiya Sangsad Bhaban.[7] The lockdown imposed by the government during the COVID-19 pandemic halted construction for several months. However, when the government allowed work in accordance with the rules to prevent infection, construction work was resumed.[4] On 29 August 2021, the trial run of the trains on the line under construction began.[8] At that time, the construction progress of MRT Line 6 was 67%.[9] Installation of all viaducts on the line was completed on 27 January 2022.[10] As of November 2022, the construction progress was 84.22%, while the progress of the first phase from Uttara to Agargaon was at 95%.[11] Train service between the two stations on this line started on 29 December 2022.[12]
Opening
.jpg.webp)
On 28 December 2022, the section between Uttara and Agargaon was inaugurated by prime minister Sheikh Hasina. The following day, public operations started with trains running non-stop between the two terminals. Service was initially limited to four hours a day, and no trains ran on tuesday.[13] On January 25, Pallabi metro station was opened.[14] From 1st March Mirpur-10 station, the fifth station of the Dhaka metro rail, was opened for commuters on Wednesday morning [15] All nine stations from Uttara to Agargaon was opened on 31 March 2023.[16]
Extension
The extension of MRT Line 6 from Motijheel to Kamalapur railway station was planned in 2019.[17] However, Kajima said it would withdraw from building a multimodal transport hub in the station area if it plans to do so. As a result, DMTCL considered three optional proposals to Kajima for extending the line. The first proposal is to build a station on Line 6 above Kamalapur metro station on Line 1 which is underground. According to the second proposal they consider planning to build the station outside the station area. According to the third proposal, they will apply for land from the ministry of Railways for constructing the station.[18] For the extension of the line up to Kamalapur, the project budget has increased by ৳11,000 crore to ৳32,985 crore. With that, the length of the line increases to about 21 km. The extension pushes the completion date for full construction to December 2025.[19] The extension work started in January 2023.[20]
Timeline
The following dates represent the dates the section opened to the public, not the private inauguration.
History | |||
---|---|---|---|
Phase date | Terminals | Length | |
29 December 2022 (3 months and 4 days) | Uttara North | Agargaon | 11.73 kilometers (7.29 mi) |
December 2023 | Agargaon | Motijheel | 8.37 kilometers (5.20 mi) |
December 2025 | Motijheel | Kamalapur | 1.16 kilometers (0.72 mi) |
Total | Uttara North | Kamalapur | 21.26 kilometers (13.21 mi) |
Stations
Code | Name | Connections | Location | Opened | |
---|---|---|---|---|---|
English | Bengali | ||||
1 | Uttara North | উত্তরা উত্তর | ![]() |
Uttara | 29 December 2022[14] |
2 | Uttara Center | উত্তরা মধ্য | 18 February 2023[21] | ||
3 | Uttara South | উত্তরা দক্ষিণ | 31 March 2023 | ||
4 | Pallabi | পল্লবী | Pallabi | 25 January 2023[22] | |
5 | Mirpur 11 | মিরপুর ১১ | Mirpur | 15 March 2023 | |
6 | Mirpur 10 | মিরপুর ১০ | MRT Line 5N | 1 March 2023[23] | |
7 | Kazipara | কাজীপাড়া | 15 March 2023 | ||
8 | Shewrapara | শেওড়াপাড়া | 31 March 2023 | ||
9 | Agargaon | আগারগাঁও | ![]() |
Agargaon | 29 December 2022 |
10 | Bijoy Sarani | বিজয় সরণি | Tejgaon | Under construction | |
11 | Farmgate | ফার্মগেট | |||
12 | Karwan Bazar | কারওয়ান বাজার | |||
13 | Shahbagh | শাহবাগ | Shahbag | ||
14 | Dhaka University | ঢাকা বিশ্ববিদ্যালয় | Ramna | ||
15 | Bangladesh Secretariat | বাংলাদেশ সচিবালয় | Paltan | ||
16 | Motijheel | মতিঝিল | MRT Line 2 | Motijheel | |
17 | Kamalapur | কমলাপুর | ![]() ![]() MRT Line 1 MRT Line 2 MRT Line 4 |
Operation
The minimum ticket price of metro rail for Line 6 is fixed at ৳20 and the fare is fixed at ৳5 per km. 12 trains have been allotted for this line, of which 2 trains are kept as backup trains.[11] The line operates for 4 hours everyday from 8.30am to 12.30pm.[22][14]
Rolling stock
The MRT Line 6 is served by 12 six-car trains, all of which are Kawasaki Heavy Industries commuter car sets. Each train car is 19.8m long, 2.95m wide, and 4.1m long, forming 120m long trains. The trains are powered by 1500 V DC via overhead line rail system, are air-conditioned and capable of traveling at up to 100 km/h.[24][11]
Reservation for women
Dhaka Metro Rail has reserved an entire compartment only for women on each train.[25]
Issue
DMTCL had a dispute with Dhaka North City Corporation authority in 2022 due to a lack of space for the MRT Line 6 station's landings and use of pavement space. As a result, DMTCL announced the acquisition of land for the landing space of stations. This announcement added some complexity to the construction project.[26]
References
- "Metro Rail: Roll-out on Victory Day next year". The Daily Star. 13 December 2021. Archived from the original on 26 December 2022. Retrieved 26 December 2022.
- Hossain, Anwar (24 December 2022). "প্রযুক্তির চমক মেট্রোরেলে". Prothom Alo (in Bengali). Archived from the original on 25 December 2022. Retrieved 26 December 2022.
- Rahman, Shamim (23 December 2022). "পুরোটাই উড়ালপথে নির্মাণ ভারতের 'মেট্রো ম্যান' শ্রীধরনের পরামর্শে". Bonikbarta.net (in Bengali). Archived from the original on 26 December 2022. Retrieved 26 December 2022.
- Zaman, Sheikh Shahriar (25 December 2022). "মেট্রোরেল ছিল বিরাট এক চ্যালেঞ্জ". Bangla Tribune (in Bengali). Archived from the original on 25 December 2022. Retrieved 26 December 2022.
- Rahman, Shamim (24 December 2022). "মেট্রোরেলেও ছাপ রেখে গেছেন অধ্যাপক জামিলুর রেজা চৌধুরী". Bonikbarta.net (in Bengali). Archived from the original on 27 December 2022. Retrieved 27 December 2022.
- "Fact box: All you need to know about metro rail project". The Daily Star. 30 April 2018. Archived from the original on 29 November 2022. Retrieved 27 December 2022.
- "যানজটের শহরে শুরু হচ্ছে মেট্রোরেলের যাত্রা". Prothom Alo (in Bengali). 28 December 2022. Archived from the original on 28 December 2022. Retrieved 28 December 2022.
- Roy Kaushik, Abhijit (5 September 2022). "মেট্রোরেল স্টেশনে পদে পদে প্রযুক্তি, শেষের পথে ৯ স্টেশন". Dhakatimes24.com (in Bengali). Archived from the original on 26 December 2022. Retrieved 26 December 2022.
- "মেট্রোরেল: পরীক্ষামূলক ট্রেন চলাচল শুরু, ঢাকার যাত্রীরা কবে চড়তে পারবেন?". BBC Bangla (in Bengali). 29 August 2021. Archived from the original on 27 December 2022. Retrieved 27 December 2022.
- "Dhaka Metro Rail milestone: Last girder segment of MRT-6 installed". The Daily Star. 27 January 2022. Archived from the original on 27 December 2022. Retrieved 27 December 2022.
- Ripon, Syed (24 December 2022). "চাকা ঘোরার অপেক্ষায় মেট্রোরেল". Dhaka Post (in Bengali). Archived from the original on 27 December 2022. Retrieved 27 December 2022.
- "মেট্রোরেলে চড়তে ভিড়, যাত্রীদের আনন্দ-উচ্ছ্বাস". Prothom Alo (in Bengali). 29 December 2022. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
- "প্রধানমন্ত্রীকে নিয়ে মাত্র ১০ মিনিটে দিয়াবাড়ি থেকে আগারগাঁওয়ে মেট্রোরেল". Prothom Alo (in Bengali). 28 December 2022. Archived from the original on 28 December 2022. Retrieved 28 December 2022.
- প্রতিবেদক, নিজস্ব. "চালু হলো পল্লবী স্টেশন, ৭ মিনিটে পল্লবী টু আগারগাঁও". Prothomalo (in Bengali). Archived from the original on 2023-01-25. Retrieved 2023-01-25.
- "Metro rail starts picking up commuters from Mirpur-10 station". www.dhakatribune.com. 2023-03-01. Retrieved 2023-03-03.
- "খুলে গেলো মেট্রোর সব দ্বার". Jamuna Television (in Bengali). 31 March 2023. Retrieved 31 March 2023.
- Adhikari, Tuhin Subhra (6 December 2019). "Metro Line-6 to link Kamalapur". The Daily Star. Archived from the original on 29 November 2022. Retrieved 27 December 2022.
- Adhikari, Tuhin Subhra (22 January 2020). "মেট্রো লাইন ৬ এর বর্ধিত পরিকল্পনা নিয়ে রেলওয়ের আপত্তি". The Daily Star (in Bengali). Archived from the original on 26 December 2022. Retrieved 26 December 2022.
- "মেট্রোরেলে ব্যয় বাড়ছে ১১ হাজার ৫১৪ কোটি, সময় লাগবে আরও দেড় বছর". Jago News (in Bengali). 18 July 2022. Archived from the original on 26 December 2022. Retrieved 26 December 2022.
- "মেট্রোরেলের কমলাপুর অংশের নির্মাণকাজ শুরু". Daily Inqilab (in Bengali). 13 January 2023. Archived from the original on 23 January 2023. Retrieved 23 January 2023.
- "মেট্রোরেলের 'উত্তরা সেন্টার' স্টেশন খুললো". Bdnews24.com (in Bengali). 18 February 2023. Retrieved 18 February 2023.
- "মেট্রোরেলের পল্লবী স্টেশনে থামা শুরু করলো ট্র্রেন". bangla.dhakatribune.com (in Bengali). 2023-01-25. Archived from the original on 2023-01-25. Retrieved 2023-01-25.
- "মেট্রোরেলের পঞ্চম স্টেশনের দরজা খুলছে আজ". Prothom Alo (in Bengali). 1 March 2023. Retrieved 1 March 2023.
- "Rolling Stock for Dhaka MRT Line-6 First Shipment". Kawasaki.com. 4 March 2021. Archived from the original on 27 December 2022. Retrieved 27 December 2022.
- "মেট্রোরেলে নারীদের জন্য আলাদা কোচ". Bdnews24.com (in Bengali). 26 December 2022. Archived from the original on 27 December 2022. Retrieved 27 December 2022.
- Rahman Rubel, Maidur (28 May 2022). "মেট্রোরেলের ল্যান্ডিং স্টেশন নিয়ে জটিলতা, পরিকল্পনায় ভুল (ভিডিও)". Rtvonline.com (in Bengali). Archived from the original on 27 December 2022. Retrieved 27 December 2022.