Hyderabad Multi-Modal Transport System
The Hyderabad Multi-Modal Transport System, commonly abbreviated as MMTS, is a suburban rail system in Hyderabad, India.[3] A joint venture of the Government of Telangana and the South Central Railway, it is operated by the latter. The 50-kilometre (31 mi) system operates on three main routes: Hyderabad–Falaknuma, Hyderabad–Lingampalli and Falaknuma–Lingampalli with a total of 120 MMTS services. Currently 86 MMTS services are being operated due to the effect of COVID-19.[4]
Hyderabad Multi-Modal Transport System | |||
---|---|---|---|
![]() | |||
![]() MMTS local train at Secunderabad | |||
Overview | |||
Native name | హైదరాబాద్ మల్టీ మోడల్ రవాణా వ్యవస్థ حیدرآباد ملٹی ماڈل ٹرانسپورٹ سسٹم | ||
Owner | Government of Telangana South Central Railway | ||
Locale | Hyderabad, Telangana, India | ||
Transit type | Suburban rail | ||
Number of lines | |||
Number of stations | 29 | ||
Daily ridership | 2,20,000 (Oct 2019)[1] 70,000 (April 2022)[2] | ||
Operation | |||
Began operation | 9 August 2003 | ||
Operator(s) | South Central Railway | ||
Technical | |||
System length | 50 kilometers (31 mi) | ||
Track gauge | 5 ft 6 in (1,676 mm) Indian gauge | ||
Electrification | 25 kV 50 Hz AC overhead line | ||
|
History
The Hyderabad MMTS project has been conceived as a joint venture between the Government of India and the Government of United Andhra Pradesh with a MoU signed in September 2000.[5] The first phase was opened to the public on 9 August 2003 by then Deputy Prime Minister of India L.K. Advani.[6] The planning and commencement of the work was inaugurated by the then Chief Minister of United Andhra Pradesh N.Chandrababu Naidu.[7] The system initially consisted of three lines, with total length of 44 kilometres (27 mi). In May 2010, Indian Railways decided to take over the 104 kilometre (65 mi) as part of the Phase II at an estimated cost of ₹ 641 crore. The Railway Board cleared the approval of the second phase after the state government agreed to fund two-thirds of the project cost,[8] which is currently under construction.
Phase I
The first phase was completed at a cost of ₹1.62 billion (US$22 million), and it was inaugurated on 9 August 2003 by Deputy Prime Minister of India L. K. Advani.[9] The project complements the city's rapid growth in information technology, biotechnology, health, aviation and tourism. This phase was completed in two streams, the first stream of MMTS between Hyderabad, Lingampalli and Secunderabad with a distance of 29 kilometres (18 mi) covering 17 stations. The second steam of MMTS between Secunderabad and Falaknuma, covering a distance of 15 kilometres (9.3 mi) with 11 stations was completed the next year, totalling the number of stations to 27 with Secunderabad being the biggest interchange of the 44-kilometre (27 mi) network.[10] The network also consists of the coverage of other areas such as Bolarum towards Manoharabad and Umdanagar which is not completely Integrated into the MMTS network. Although many other routes and stations were available, the process of electrification of these other routes were included in the Phase II.[11]
MMTS Route | Name | Services |
---|---|---|
Hyderabad–Lingampalli | HL | 26 |
Lingampalli–Hyderabad | LH | 23 |
Hyderabad–Falaknuma | HF | 3 |
Falaknuma–Hyderabad | FH | 5 |
Falaknuma–Lingampalli | FL | 28 |
Lingampalli–Falaknuma | LF | 30 |
Secunderabad–Falaknuma/Umdanagar | SF, SU | 3, 3 |
Umdanagar/Falaknuma–Secunderabad | FS, US | 3, 3 |
Secunderabad–Lingampalli | SL | 2 |
Hyderabad–R. C. Puram | RH | 1 |
Falaknuma–R. C. Puram | FR | 2 |
R. C. Puram–Falaknuma | RF | 1 |
Phase II
The Hyderabad Metropolitan Development Authority (HMDA) has planned for the development and expansion of the MMTS to all Hyderabad rail routes in its Master Plan 2041.[12] In May 2010, Indian Railways decided to adopt the MMTS' 104-kilometre (65 mi) Phase II project at an estimated cost of ₹ 641 crore. The Railway Board approved Phase II after the state government agreed to fund two-thirds of its cost. It was expected to be completed by 2018, and will handle 300,000 passengers a day. A 6-kilometre (3.7 mi) stretch from Lingampally to R. C. Puram and a 12.5-kilometre (7.8 mi) stretch from Bolaram to Medchal was scheduled to begin in March 2018, and the 12-kilometre (7.5 mi) Moula Ali–Ghatkesar stretch was scheduled to open in July 2018 but it was delayed due to several reasons. Regardless of the delay trial runs started on few sections of phase 2 in August 2020.[13] Quadrupling 4 lines with electrification and installation of Automatic block signaling in the existing double line between Ghatkesar and Moula Ali, doubling & electrification between Falaknuma and Umdanagar in the southern part of city; Doubling and electrification between Moula Ali and Sitafalmandi, connecting Malkajgiri and doubling with electrification between Moula Ali and Sanathnagar along with construction of 5 new stations in the section for providing east-west connectivity bypassing Secunderabad station.[14]
The Phase II was stalled for over a decade owing to lack of funds. The Union Government allocated ₹ 600 crore as part of the Union budget (2023-24) towards it for resumption of phase II works. Over time, the sanctioned cost has been escalated to ₹ 1,150 crores.[15]

Segments
- Secunderabad–Bolarum–Medchal: 28 kilometres (17 mi)
- Falaknuma–Umdanagar–Shamshabad Airport: 20 kilometres (12 mi)
- Secunderabad–Moulali–Ghatkesar: 19 kilometres (12 mi)
- Moulali–Sanathnagar chord line 21 kilometres (13 mi)
- Kacheguda–Sitaphalmandi–Malkajgiri–Moulali chord line 10 kilometres (6.2 mi)
Stations under construction:[16]
Line | Terminal | Length | Year | |
---|---|---|---|---|
MT 08 | Ghatkesar | Raigir(Yadadri) | 33 km (21 mi) | 2021 |
MT 09 | Umdanagar | Shadnagar | 31 km (19 mi) | 2021-2031 |
MT 10 | Medchal | Topran | 21 km (13 mi) | 2021-2031 |
MT 11 | Tellapur | Ravullapalli | 21 km (13 mi) | 2021-2031 |
MT 12 | Topran | Ramayanpet | 34 km (21 mi) | 2031-2041 |
MT 13 | Raigir(Yadadri) | Jangaon | 32 km (20 mi) | 2031-2041 |
MT 14 | Shadnagar | Jedcherla | 24 km (15 mi) | 2031-2041 |
MT 15 | Ravullapalli | Vikarabad | 24 km (15 mi) | 2031-2041 |
MT 16 | Bibinagar | Nalgonda | 72 km (45 mi) | 2041 |
Stations
Lines
SUBURBAN Route
Suburban Route | Name | Services |
---|---|---|
Secunderabad–Hyderabad | SH | 2 |
Secunderabad–Bolarum | SB | 6 |
Bolarum–Secunderabad | BS | 6 |
Secunderabad–Manoharabad | SMB | 4 |
Manoharabad–Secunderabad | MBS | 6 |
Malkajgiri–Bolaram | MJB | 1 |
Secunderabad–Malkajgiri | SMJ | 1 |
Secunderabad–Medchal | SM | 6 |
Medchal–Secunderabad | MS | 6 |
Falaknuma–Umdanagar | FU | 6 |
Umdanagar–Falaknuma | UF | 5 |
Moula Ali–Kacheguda/Falaknuma | 1, 2 | |
Falaknuma–Bhuvanagiri(BG) | FB | 1, 1 |
Falaknuma–Jangaon | FM-ZN | 1 |
Jangaon–Falaknuma | ZN-FM | 1[17] |
Current
The Hyderbad MMTS currently operates in 3 major lines.[lower-alpha 1]
Minor Lines
Major Lines
Milestones
- On International Women's Day 2012, S. Satyavati was South Central Railway's first female driver, when she drove the MMTS Matrubhumi Ladies Special Train from Falaknuma to Lingampally.[18]
- HYLITES (Hyderabad Live Train Enquiry System), a mobile app for MMTS station and train inquiries, was introduced.
- UTS stands for Unreserved Ticketing System. It is an app launched by Indian Railways’ subsidiary body CRIS in 2014 to generate or cancel unreserved train tickets, book seasonal tickets, renew passes, and purchase platform tickets. The initiative saves passengers from getting into long queues to take Printed Card Tickets (PCTs) for local train travel or platform visits
Notes
- The line color represented here are unofficial. They serve the purpose of differentiation only
References
- "After Hyderabad Metro, MMTS witnesses heavy rush of passengers". Telangana Today.
- "MMTS is easy on the pocket, fast on the track". The Hindu.
- "MMTS: Affordable but few takers".
- Desk, The Siasat Daily (15 April 2022). "Hyderabad: South Central Railway restores 86 services of MMTS". The Siasat Daily. Retrieved 7 February 2023.
- "Rs 4,500-crore MMTS project report under way". Business Standard. 16 February 2004. Retrieved 28 February 2020.
- "Advani flags off Hyderabad MMTS | CM Chandrababu Naidu". The Times of India. 9 August 2003. Retrieved 29 February 2020.
- "2 railway projects to start today". The Times of India. 1 November 2001. Retrieved 29 February 2020.
- "State to loosen its purse for MMTS phase-II project". The Times of India. 21 April 2010. ISSN 0971-8257. Retrieved 7 February 2023.
- "Advani flags off Hyderabad MMTS". The Times of India. 9 August 2003. ISSN 0971-8257. Retrieved 7 February 2023.
- Geetanath, V. (8 August 2019). "After 16 years, MMTS has a long way to go". The Hindu. ISSN 0971-751X. Retrieved 7 February 2023.
- "Route electrification done, but MMTS Phase II yet to start services". The New Indian Express. Retrieved 7 February 2023.
- "MMTS future phase up to 2041".
- "MMTS phase-II trial begins, covers 90 km". The Times of India.
- "key phases of MMTS-II project commissioned". The Hans India.
- "Rs 600 crore fund booster to Hyderabad's Multi-Modal Transport System phase 2". The Times of India. 4 February 2023. ISSN 0971-8257. Retrieved 7 February 2023.
- "MMTS 2nd phase: First stretch likely by Dec 2017". The New Indian Express.
- "MMTS Route Map". Mmtstraintimings.in. Retrieved 27 February 2016.
- "Woman drives local train in Hyderabad, first for South Central Railways". The Times of India. Archived from the original on 26 January 2013.